Skip to Main Content

Photo Albums

Football Field 8-4-10

a crane lifting a metal frame

9:30 AM
The crew getting final preparations ready for scoreboard installation. 

a man in a helmet on a lift

A support beam needed to be welded to the frame for the message board.

a yellow and black roller on a road

Everything needed to be ready for the turf inspector, who must approve the field's grade before turf can be put down.

a truck with a bucket and water bottles

With temperates in the upper 90's and a heat index close to 110, it was important for the crew to stay hydrated.

a group of people working on a metal structure

1:30 PM
The message board gets installed.

a group of men working on a construction site

Next up is a portion of the scoreboard that shows time-outs remaining.


Download Album Photos