Soccer Construction - 6/22/11

a field with a white line

The first rolls of turf were rolled into place on the new soccer field Tuesday afternoon. The FieldTurf crew anticipates anywhere between 14 and 17 days of work to complete the surface installation. Photos by Brent Harris.

men in hardhats rolling a large white bag on a green field

 The crew rolls out the next section of turf upside down, then sews the seams together before flipping it over to add the next section.

a group of men wearing hardhats and white helmets

 The seams have to match up perfectly.

a machine on a cart

This pneumatic sewing machine has three spools of white thread and one spool of green thread to lock each section of turf in place.

a group of large white bags

 The next rolls of turf are ready to be installed.

a group of men working on a construction site

Work also continues on the rest of the soccer stadium. The cement for the stands was being poured Wednesday morning.

a group of men painting a wall

 Final touches are being applied to the outside area of the stands, as well.

a crane pouring concrete into a construction site

A view of the new soccer stadium stands from the football stadium.

a white building with a yellow ladder

A new storage building is nearly complete at the south end of the stadium. The soccer and track and field teams will use this facility to store equipment.

a concrete circle with a hole in it

The construction project will also provide new areas for the track and field team. This shot put circle is just south of the soccer field and will be used for practice and home meets.

a concrete stairs being constructed

 These stairs lead from Jennison Street down to the field level of the soccer stadium.

a parking lot with trucks and trees

The FieldTurf crew began the installation on the south end of the field and will move across the to the north edge over the next few days.