Skip to Main Content

Photo Albums

New Student Housing

a brick building under construction

The new town homes are few busy construction days from seeing furniture and returning students.

a man wearing a hard hat and holding a window

Some of the blinds have been installed

a shower with a tile wall

Each town home has four bedrooms and three full bathrooms.

a shower head with water coming out of it

Checking the water flow in one of the upstairs bathrooms.

a room with a few items on the floor

The common living space downstairs

a kitchen with dark cabinets and a sink

The kitchen

a building under construction with scaffolding

The halls and lodges are set to open in January.

a metal frame in a building

This side of the hall will be suites.

looking up at a building

The stairwell

a construction site with a crane and a building

Looking north toward Cole Hall.

a metal stairs in a brick wall

The elevator shaft

a brick wall with a hole in the wall

The fireplace in the hall's common living space.

a construction site with scaffolding and metal frame

The beam center top is the beam many students signed during the spring semester.

a construction site with several large containers

Preparing the concrete to pour the final footings.

a construction site with a truck and a pile of dirt

New student housing isn't the only construction. This will soon be the home of Little Giant Wrestling.


Download Album Photos

Back to Top